Showing posts with label Track. Show all posts
Showing posts with label Track. Show all posts

Wednesday, 5 July 2023

O Gauge Goods Shed diorama.

As yet un-named diorama in O gauge. It will be used mostly as a scenic backscene.

At 3ft long by 8 inches wide it wont take up much storage space.

Track is PECO bullhead with a couple of buffer stops all ballasted with coarse chippings secured, as usual, with dilute PVA.

Few more bits to add as items are being built for another O gauge layout.



 

Friday, 22 April 2022

00 gauge Watershoot Bay fiddle yard.



 Aligning the tracks on any layout has always called for some ingenuity.

Whilst the tracks line up satisfactorily current still needs to be transferred to the chosen track. So, this time some square brass tube has been soldered to a basethrough which a square peg can be passed through and provide current transfer.

Once cleaned up, the parts are soldered together- my 25Watt iron is slightly underpowered for this job.


Once glued and tacked to the board and sector plate it provides a secure alignment system. Just need to wire in the connecting wires.


Friday, 18 March 2022

Ballasting Watershoot Bay.


The part I least enjoy as here it could all go badly wrong. This is one part of layout construction which needs time and patience!

The ballast, cream this time, was gently eased into place avoiding the immediate area around the points.

The sticks were added to keep the blades away from other rails- last thing you need is these stuck together.

Once satisfied with the loose ballast, I give the whole area a gentle mist- from an atomiser (remove smell of fragrance first) which contains water and a spot of washing up liquid. This 

aids the spread of the adhesive. A mix of 50/50 water and PVA glue is mixed in a jar and again a spot of washing up liquid.

I use a cheap polythene pippette to apply the mix to the ballast- others use an eye dropper.

Once the whole area has been saturated with the glue mix it is time to wait for it all to dry thoroughly- don't try and cut corners now or it will all end in tears!
 

Once dry the missed areas and the points can carefully be ballasted. Small amounts at a time and lots of patience.

Wednesday, 19 January 2022

Track base colour applied to Watershoot Bay.

With all the track in position and before I start the wiring the track has been given a coat of dark brown.

This is before the rail sides are given a brush of rust.

The turnouts have all been masked and the contact areas given extra protection to ensure electrical conductivity once it is all wired.

All three boards have been treated to ensure continuity of colour.


 

Friday, 14 January 2022

Watershoot Bay fiddle yard.

The fiddle yard has been attached and rails added. Rails have been soldered to brass flat head screws  between boards which gives a secure attachment. 

The fiddle yard board has single sided copperclad paxolin glued and pinned to the sector plate. This gives simple alignment which will need some form of electrical continuity. 

Three roads should be enough storage for a small layout- a piece of sponge has been glued to the end of the fiddle yard to hopefully avoid damage.

The stock is shown in the lower picture to ensure there is sufficient space for the envisaged train formations.


 

Thursday, 30 December 2021

Buffer stops for Watershoot Bay.

I was considering the products of Lanarkshire models but their website couldn't be accessed for what I wanted so I thought I would try PECO'S latest offering.

This is a much more detailed product but not as robust as their Streamline code 100 version.

However, it does glue together - I used MEK. It does fit code 75 track but fitting has to be taken with care. That said, once fitted it is a fine model and a couple will grace Watershoot Bay.


 

Saturday, 3 July 2021

00 gauge Adams 02 on a layout at last!

30207 has finally made it on to a layout albeit a Western Region one.

St Mewan is the easiest of my 00 gauge layouts to set up.

It makes a good test track having code 75 rail and pointwork so if it works on this it will probably work anywhere.

There is also a passing loop to check bogie throw , magnets are placed (removable) to make sure couplings uncouple where needed- if they work at all.

Must crack on with the push-pull set!


 

Wednesday, 23 June 2021

SMP 00 Gauge point kit.

Something I have never tried before is to build track.

When this appeared on an auction site with a ridiculous buy it now price I thought at this price it's too good an opportunity to miss.

It is actually two kits. One for a three way turnout, the other can be made as a long crossing or single or double slip.

Must read up to see if I need track gauges etc.

So much now to make!

 


Monday, 10 August 2020

Wiring Gwartha Vellan 009.

Nice and hot over the weekend so migrated to the workshop , which is nicely insulated, and spent some relaxing (read frustrating) hours wiring . With the trusty multimeter it seems to work but the main feeds have yet to be added. Sorry for the single paragraph but this new Blogger won't let me start a new one! The chaps at ESR Electronic components delivered my order in quick time and very reasonable.       https://shop.esr.co.uk/index.html 
                           Two of the five boards - must get some more plug covers.
 

Tuesday, 7 July 2020

009 Norfolk Heath drop front board.



This area will eventually become a loading area for canal boats.

The track has been glued down and Wills rough stone cut as the wharf reinforcing.

I am not yet decided how deep the wall will extend so I must recover the barges to measure their height from waterline to deck.

Friday, 24 April 2020

St Mewan Control Panel!


A grand name for something so small!

Apart from the handheld controller which plugs in, this is the nerve centre of St Mewan.

Five point levers and one isolating lever and three section switches and that's it.

Everything on St Mewan is operated from a double 16V AC outlet transformer the leads of which just clip in. And- at long last it all works!

Thursday, 23 April 2020

Platforms for St Mewan.


Whilst waiting for paint to dry, I had a think about the platform for St Mewan.

Was I going to take the easy route and use ready formed platform edging? No, not me- I am a punishment glutton!

Numerous pieces of mounting card cut up to provide the foundation and face. Then the face was covered in Builder Plus-(Howard Scenics are similar)brick paper and a narrow strip for the overhang was affixed.

Probably a bit premature but the face has been glued down on one board before I have ballasted the track. At least the ballast will butt up to the platform edge


Monday, 20 April 2020

St Mewan-Painting the track.


Now that the track is all laid and working-don't ask, it is time to paint the sleepers.

Usually I spray the track with a brown Humbrol rattle can but, as I don't have enough and can't be bothered to get the airbrush out some old Humbrol enamels will be used. These I have had for ages and after a thorough stir were mixed in various quantities and thinned slightly.

The mixture is very easy to apply and brings out the grain of the sleepers really nicely.


Very difficult to see the grain plainly due to my poor camera skills.

I think you get the idea though. Once completed and allowed to dry I will start on the chairs and rail sides.

 This will probably take some time so I will probably look for something else to do in the meantime -  Think there is an 0 gauge Palvan to finish!

Then Ballasting- O joy!