Sunday, 5 January 2020

0 Gauge Lima coach bogies.

 The bogies arrived from Premier Components just before Christmas.

The castings are excellent and very easy to assemble. I chose parallel bearings paired with Peartree wheels.

Once made they were fitted to the coach which needed some of the original bogie pivot moulding removed.

The coach now rides at the same height as the brake coach and the Class 33.





No comments:

Post a Comment