Occasional mutterings about model railways, 3mm,4mm,7mm and 009 Narrow Gauge.
Sunday, 15 September 2019
East Boldre point operation.
KISS- keep it simple silly- Is a phrase I try to adhere to.
Yes, I know I have electrically operated points on other layouts but in the main I like good old fashioned wire in tube with changing polarity enabled by a simple slide switch.
To the left is a close up of the business end with the lower pic showing a couple mounted and with holes through the backscene to enable grubby fingers to actually change (slide) the things!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment