Monday 29 October 2018

009 Woody Lane- let the detailing begin!!


So after what seems an interminable wait the glue has finally dried on the expanded polystyrene and, with the help of strategically placed strips of masking tape has been liberally plastered with random shaped pieces of newspaper which have been coated with wallpaper paste- you can tell that every expense has been spared here!

The base for the mineral line has been glued in place aided by boxes of nails and batteries to hold firm whilst curing
 The pic above shows the whole of the viewing part of the layout together with its nameboard.

Sorry about the poor picture I tried to get the whole thing in view which compromised the focus!

<<Heavy narrow things to keep the track base in place.

Below is one of the tunnel entrance/exits loosely placed.

No comments:

Post a Comment