Friday, 7 April 2017

Woody Lane final trackplan-009 Narrow Gauge.

The final trackplan has been decided and laid. This gives a much simpler and less regimented plan than that originally laid. It also negates the need for switches and control panel. The number of turnouts has also been reduced. the running is pretty good which will be a priority as it is basically designed as a continuous run to watch the trains go by. Once running is satisfactory the track can be sprayed and ballasted.

T


No comments:

Post a Comment