Hillbrow will be attending so please say hello if you are there.
Occasional mutterings about model railways, 3mm,4mm,7mm and 009 Narrow Gauge.
Wednesday, 28 February 2018
Tuesday, 27 February 2018
Woody Lane-009.
Here we go again- I have decided that Woody Lane will be a terminus to fiddle yard all contained within two baseboards totalling 7ft x 16inches.
The nameboard has already been made as previously published.
So-track laying has already started with some slots made for point motors and BCB fitted for cross board connection.
The design has allowed for the layout to be operated from one end so I can operate when stored on a shelf.
Again it will be supported on trestles thus cutting down weight.
Sunday, 25 February 2018
009 GVT Tram loco- number two!
As I had a second Graham Farish (Poole) 94XX chassis it seemed natural to build another GVT loco.
This one differs having a redoilcan on the left hand side.
All was going well until the chassis was fitted- it wouldn't run satisfactorily. However, I had a later Farish (China) 57XX chassis which, on checking, provided a replacement armature and brushes. The swop was made and now I have two smooth running locos.
This one differs having a redoilcan on the left hand side.
All was going well until the chassis was fitted- it wouldn't run satisfactorily. However, I had a later Farish (China) 57XX chassis which, on checking, provided a replacement armature and brushes. The swop was made and now I have two smooth running locos.
Friday, 23 February 2018
009 Rheanus
and numberplates.
I did want to fit a brass handrail onto the tank but eyesight conspired against me so the original plastic fitment has been re-attached.
One of Monty'sfigures has been installed as crew.
A quick spray of Dulcote ensures that minor blemishes are concealed.
Wednesday, 21 February 2018
009 Kerr Stewart and 009 Society wagons.
Well GNU has been completed and had a coat of Testors Dulcote to seal the transfers.
Closely in attendance are the new 009 Society wagons which will be GNU's usual load.
Makes a good combination for a small layout- so must get my inspiration cap on!
Closely in attendance are the new 009 Society wagons which will be GNU's usual load.
Makes a good combination for a small layout- so must get my inspiration cap on!
Monday, 19 February 2018
Ashover Coach-009.
This coack has been made from the Meridian Models kit- purchased from Narrow Planet.
As the coach will be used on a freelance layout, it has been finished in blue with a yellow lining stripe to releive the solid side colour.
Greenwich couplings have been fitted .
As the coach will be used on a freelance layout, it has been finished in blue with a yellow lining stripe to releive the solid side colour.
Greenwich couplings have been fitted .
Saturday, 17 February 2018
Rheanus Components.
Sometimes it is a pleasant surprise to be able to dismantle a model without breaking several items.
Well, Bachmanns Rheanus is one of those models.
To the right is all separate parts removed and saved to be replaced when painting is complete.
Even the centre saddle tank handrail, which looked a little flimsy has been saved- however, this will be replaced with brass handrail and knobs.
Well, Bachmanns Rheanus is one of those models.
To the right is all separate parts removed and saved to be replaced when painting is complete.
Even the centre saddle tank handrail, which looked a little flimsy has been saved- however, this will be replaced with brass handrail and knobs.
This is the complete chassis as removed. All that will be done is to paint the cylinders before refitting.
The backhead detail has been superglued to the basic moulding- will look better when a bit of dry-brushing has been done.
Subscribe to:
Posts (Atom)