Saturday, 6 April 2019

3mm Churchward Toplights.




Firstly is a new build coach from a Worsley Works set of etches.

I have gone to town on this one having fitted door and grab handles.

This one needs a 3 compartment assembly made then numbered , roof given a second coat and maybe lined and numbered before varnishing and glazing.

The second one has been revamped with door and grab handles and a fresh coat of paint.

This one has the wrong roof details but I don't want to destroy it trying to remove the roof.

I am also sure that the bogies are wrong which would mean redrilling the floor so I will probably live with this also.

What fun railway modelling is- when will the rivet counter strike?

No comments:

Post a Comment