So- next up is ballasting. A mixture of grey granite has been applied, misted with washing up liquid water and then dilute PVA applied with a pipette. Black ballast was sparingly applied where engines will stand.
Still pictures are better than words so see below.
 The loop where the station buildings will reside.
 Pointwork controls.
 Section control-the panel was made by Jurassic.
 Fiddle yard point control- couldn't see the need for mounting under the baseboard.
 
No comments:
Post a Comment