Occasional mutterings about model railways, 3mm,4mm,7mm and 009 Narrow Gauge.
Wednesday, 27 July 2016
Woodlands
Well- finally finalised the trackplan and laid track. A sunny Saturday saw the trackbed sprayed with Humbrol matt brown and the rail sides with light rust.
As shown I have obtained the Woodlands sign from Station Signs.
The platform edges have been fixed- Ratio concrete- and painted after undercoating with matt grey.
Doesn't look too bad?
No comments:
Post a Comment