The signal was obtained as a non-working Dapol product and was the only Western signal I possess.
Also in the pipeline is some point rodding which I am slowly assembling during glue drying moments.
I am weighing up whether a Water Tower would be suitably located behind the signal but am unsure of this site as it would mean that the loco being 'watered' would be across the turnout.
No comments:
Post a Comment