St Mewan is the easiest of my 00 gauge layouts to set up.
It makes a good test track having code 75 rail and pointwork so if it works on this it will probably work anywhere.
There is also a passing loop to check bogie throw , magnets are placed (removable) to make sure couplings uncouple where needed- if they work at all.
Must crack on with the push-pull set!
No comments:
Post a Comment