Pages

Sunday 23 September 2018

A pair of 009 Bridges.

 Slowly the terrain is taking shape on Woody lane.

A couple of bridges have been made- the first- left- is a Wills SS28, single track occupational bridge with stone abutments.

The deck has been affixed to 1. give strength and 2. has been narrowed for 009.

Already undercoated, I must decide on the colour to be applied on the metalwork.
The second bridge is the PECO 'N' Gauge bridge which has been heightened with the addition of stone effect plasticard.

The stonework is basically grey primer with individual stones picked out by dry brushing.

Shown in position, the surroundings have to be coated with papier mache and then sealed before scatter materials can be affixed.

No comments:

Post a Comment