These are the new baseboards for my new
4mm layout-Woodlands.
With a 2x1 inch softwood frame topped with 9mm ply it has integral legs also of 2x1 softwood.
The legs are kept in place with stays rescued from a broken paste table. These are located by plastic furniture blocks.
The wiring is in place but I think my electrical skills need help as the bit I have done- the rest was wired by Nigel-has resulted in a short and the point motors won't work.
So more work needed before ballasting and scenic work can begin.
No comments:
Post a Comment