Cringle St. now has a loading gauge- a PECO one (in packets of two) as this comes complete with post .
Supplied as a kit of four pieces it is a quick and accurately moulded item to assemble.
There is a base supplied but a quick turn of a drill bit in a pin vice sorted the mounting hole and the loading gauge glued in place.
The awning has been painted cream and the whole low relief building has been secured with a screw through the backscene so it can easily be removed.
A blank platform awaits detailing with aforementioned trollys and sack trucks and loads of various kinds.
There is also a mounting for fire buckets to be painted and installed.
This shows the whole of the layout with pelmet attached. There is a row of LED's which provide the lighting. I have asked Jurassic to make the sign for me so apart from detailing the main work is done.